Waterway Crossing Point (1)
Inverter Station (2)
| Primary Array |
| Alternate Array |
| Optional Array |
Bore Point (3)
Substation Proposed (4)
Substation Proposed Interior Areas (5)
Substation Proposed Interior Linework (6)
Proposed Interconnection Transmission Line (7)
Fence Line (8)
Collector Underground 35kv (9)
Roads (10)
Proposed Arrays (11)
| Primary Array |
| Alternate Array |
| Optional Array |
Laydown Yard (12)
Wetland Area Impacts (13)
Wetland Area (14)
Waterway Ditch Area (15)
Project Boundary (16)
Inverter (19)
Collection Lines (20)
| Bore |
| Trench |
Arrays (21)
Array Areas (22)
Access Roads (23)
Inverter (25)
Collection Lines (26)
| Bore |
| Trench |
Arrays (27)
Array Areas (28)
Access Roads (29)
Substation (30)
Substation Parcel (31)
Operating and Mainenance (32)
| O&M Area |
| O&M Building |
Laydown Yards (33)
Gen-Tie Line (34)
Gen-Tie Line Easements-100 ft (35)
Wetland Area Desktop (36)
Weland Area Field Delineated (37)
Waterway Area Desktop (38)
Waterway Area Field Delineated (39)
Open Water Area (40)
Fence (41)
Project Area Boundary (42)
|